30 Jun
2003
30 Jun
'03
1:33 a.m.
Dik, Start with a single main reef and standard working jib. Reef the main first and keep the working jib up. If the wind pipes up go to a double main reef. If that is still too much canvas go to the smaller and heavier weight storm jib. There is a point where the main comes down and you run or heave to. Bill