Dik,
Start with a single main reef and standard working jib.  Reef the main first and keep the working jib up.  If the wind pipes up go to a double main reef.  If that is still too much canvas go to the smaller and heavier weight storm jib.   There is a point where the main comes down and you run or heave to.

Bill