7 Nov
2011
7 Nov
'11
9:24 a.m.
I finished cutting out all the tripod mounting blocks and will get them drilled and tapped this week. All the various components are basically done, just the drillling and tapping, priming and painting remain before final assembly. The first finished examples should be ready for delivery before Thanksgiving. I assemble each one individually, one at a time. I prefer this method to the assembly-line method, which I only use for production of the individual parts. Stay tuned.