Re: M_Boats: Downsizing to a smaller trailerable
4 Nov
2004
4 Nov
'04
1:25 a.m.
Michael, The time it takes to rig a trailerable sailboat is often a factor of organization. When I was day sailing Miss T, in the days before the bimini, I could easily have it in the water sails rigged and ready in 20 minutes. But I was much better organized back then. The hardest part was getting the motor from the truck to the boat. These days with the Bimini and extra stuff, it takes longer, and now that I am retired, I am not in as much of a hurry. John Edwards
7687
Age (days ago)
7687
Last active (days ago)
0 comments
1 participants
participants (1)
-
Saltm17@aol.com